Address: Teamar, 60m St. Near Van Steel

Egg Production Poultry Project

A02 (1)A02 (1)
A01A01
defaultdefault
defaultdefault
defaultdefault

Egg Production Poultry Project

Metal Work Company proudly took on the design and installation of the iron structure for Iraq’s largest egg production poultry facility, marking a significant milestone in the nation’s agricultural and industrial development.

This ambitious project spans an impressive 18,000 square meters and includes the construction of over 10 state-of-the-art poultry halls, each meticulously engineered for durability, functionality, and high performance.

Crafted with premium-quality materials and built to endure, these robust structures were developed with a sharp focus on long-term resilience and environmental protection. Every hall was designed not only for structural integrity but also for maximum operational efficiency, supporting high-volume egg production under optimal conditions.

From the drawing board to final installation, our team ensured that every detail met international standards of quality and precision. The result is a comprehensive, large-scale solution tailored to the rigorous demands of modern poultry farming.

This landmark project reflects Metal Work Company’s unwavering commitment to delivering innovative, industrial-grade structures that power progress across Iraq’s key sectors.

en_USEnglish